Whole-Home Renovation in Richmond
A whole-home renovation is one coordinated project, not a dozen disconnected ones - and that's exactly how it should be priced. We plan and quote entire Richmond homes as a single fixed-price scope, so the biggest renovation you'll ever take on comes with one honest number.
What a whole-home renovation involves
A whole-home renovation coordinates work across most or all of the house in a single project: kitchen, bathrooms, flooring, lighting, and whatever electrical, plumbing, or structural work the scope requires. Done as one project, you pay for one mobilization, one permit package, and one trade schedule - which is why renovating all at once generally costs less in total than tackling the same rooms one at a time over several years.
Our job is as much project management as construction. We walk the entire house, price every room and every system as one complete scope, and sequence framers, electricians, plumbers, tilers, and finish carpenters over the months the project runs. You deal with one point of contact, the owners visit the site often enough to catch issues before they become problems, and you hear from us every week about what's done, what's next, and what to expect. Whether you stay in the home or move out during the work is a real cost and schedule decision - we help you run both scenarios before the plan is locked, not after.
This scope suits owners of older Richmond homes where the systems need updating anyway, families who've outgrown their layout but not their street, and anyone who has watched a room-by-room approach quietly cost more than it should have. It's a big number no matter how you slice it - which is exactly why it shouldn't be a moving one.
What's included
Design & scope development
Every room, finish, and system decided and priced on paper before demolition - where changes cost nothing.
Structural changes
Wall removals and layout reconfiguration with engineer-stamped drawings and proper permits.
Kitchen & bathrooms
The two most expensive rooms in any home, planned first because they typically drive half the budget.
Electrical & panel upgrades
Rewiring, panel capacity, and lighting throughout - the work that makes an older home safe to modernize.
Plumbing & mechanical
Re-piping, fixture relocation, and heating or ventilation upgrades coordinated across the whole house.
Flooring & finishes
Consistent flooring, paint, trim, and millwork across every room, installed in the right sequence.
Permits & inspections
One coordinated permit package with staged inspections, instead of separate applications per room.
Living-through-it planning
Sequencing that keeps a bathroom and temporary kitchen usable if you stay, or a compressed schedule if you move out.
When a renovation becomes a rebuild in the eyes of the building code
The building code doesn't only ask what you're adding - it asks how much of the original house is left. Strip a home back to its skeleton of studs, floors, and roof framing, and building officials can treat the project less like an alteration and more like new construction. Vancouver formalizes this in its own building by-law, which devotes an entire part to existing buildings and defines "reconstruction" explicitly; other Lower Mainland municipalities reach similar conclusions through their alteration provisions.
Crossing that line can pull in current-code requirements you weren't planning to touch - most notably energy performance, since a substantially reconstructed home can be asked to meet the same efficiency standards as a new one. Whether your scope crosses it depends on your municipality and your drawings, which is why we settle the question during design rather than discovering it at plan review, after the budget is set.
The paperwork hiding in an older home's walls
If your house predates 1990, provincial law assumes its walls may be hiding asbestos - in drywall compound, vinyl flooring, insulation, duct wrap - and WorkSafeBC requires a hazardous-materials survey by a qualified professional before renovation or demolition work begins. Since January 2024, asbestos abatement in BC may only be done by licensed firms with certified workers, and there's a public registry where anyone can verify a licence before the containment goes up.
If the project involves taking down large parts of the house, a demolition permit enters the picture, and some municipalities go further: Vancouver, for one, requires most of an older home's materials by weight to be reused or recycled rather than landfilled. None of this is optional, and none of it should be a surprise - it belongs in the scope and the schedule from the first version of the plan.
Decide your electrical future before the drywall closes
A whole-home renovation is your one clean chance to size the electrical service for where homes are actually heading: a heat pump, an EV charger, an induction range. Each is manageable alone, but together they can push an older 100-amp service past its limit - a question a licensed electrician answers with a load calculation against your square footage, heating, and appliances, not a guess.
Upgrading the service involves a licensed electrical contractor, a Technical Safety BC permit, and coordination with the utility - straightforward during a renovation, when the walls are open and the electrician is already on site, and disproportionately disruptive as a standalone project two years later. Even if the heat pump or the car is a someday plan, running the capacity and the rough-ins now is the inexpensive version of that decision.
The build runs to an inspection rhythm - and so does living in it
Municipal inspections arrive in a fixed order - footings where there's excavation, framing with the plumbing and electrical rough-ins still visible, insulation and vapour barrier before drywall, then the finals - and on a whole-home scope that rhythm repeats zone by zone. Closing a wall before its inspection passes risks being ordered to open it again, so the schedule is built around inspection days rather than in spite of them.
If you're living in the house in Richmond while it happens, the same sequencing is what keeps you sane: dust barriers between zones, utility shut-offs announced days ahead rather than discovered at breakfast, and the one working bathroom renovated last, not first. The mid-build weeks are the real test of a contractor's communication - you should always know what's happening tomorrow, and why.
Permits & approvals in Richmond
Nearly every whole-home renovation triggers permits - structural, electrical, and plumbing changes almost always require them, with inspections at set stages, and structural work needs drawings stamped by a licensed engineer. In Richmond we assemble the permit package as one coordinated application, bring in the engineers, and attend the inspections, so approvals never become the reason your schedule slips.
Permits run through the City of Richmond, and the delta ground adds considerations other cities don't have: flood construction levels affect how low habitable space can sit, and anything changing the building's relationship to grade gets looked at through that lens. Townhome and condo projects need strata approval alongside the city permit, and Richmond's large strata inventory means that second track applies to a big share of projects here. We manage both approvals in parallel and build the review window into the schedule from the first conversation.
- Basements are rare — the water table is high across the city — so 'more space' conversations here are usually about reworking the ground floor or going up
- East Richmond borders the Agricultural Land Reserve; properties on that fringe can carry rules a standard city lot doesn't
- Wood-frame condos and townhomes from the late 80s and 90s predate rain-screen construction — envelope and remediation history is worth checking before interior investment
- Perimeter drainage and sump systems do real work in Richmond; we verify them before finishing any ground-level space
How the building permit process works in Richmond
Richmond runs permitting through its Building Approvals Department, and as of mid-2026 most applications start online in the MyPermit portal, reached through a MyRichmond account. The portal walks you through the application step by step and shows only the requirements that apply to your project type. Gas, plumbing and sprinkler permits go through the same portal, and the permits counter at City Hall remains open for anyone who prefers to apply in person.
Two practical details are worth knowing before you start. The city will not release a permit until the contractor's business licence is active, so that paperwork needs to be in order early. And inspections are self-serve: they are booked through Richmond's online inspection system using the permit number and access code printed on the permit itself, with requests made by evening generally scheduled for the next business day. We sequence those bookings so nothing gets covered up before sign-off.
One Fixed Price
What we quote is what you pay. Our proposals are complete and itemized, so the number you sign is the number you settle on.
Communication First
Same-day answers, weekly updates, and one point of contact from the first call to the final walkthrough. You always know where your project stands.
Owner-Operated
The people you meet are the people who plan, manage, and stand behind the work. Full-scope general contracting — not a handyman service.
How your whole-home renovation runs, start to finish
- 01
Initial Consultation
We meet to discuss your project, review your plans, and give you an honest assessment of scope, timeline, and budget.
- 02
Detailed Estimate
A complimentary site visit followed by complete, transparent pricing. No guesswork, no surprises.
- 03
Design Coordination
Already have plans? We review them. Need design support? We connect you with the right people and manage the process.
- 04
Pre-Construction
We handle permits, finalize schedules, and coordinate trades before a single tool hits the site.
- 05
Build & Execution
Our team performs the work directly. Weekly updates, same-day communication, and daily quality control throughout.
- 06
Handover
Final walkthrough, warranty information, and post-completion support. Built to last, documented clearly.
Whole-Home Renovation in Richmond: FAQs
How much does a whole-home renovation cost in Richmond?
Most whole-home renovations in Richmond run $150,000 – $300,000 for a mid-range scope, with cosmetic refreshes starting around $60,000 and high-end or luxury projects reaching $550,000 or more. Where your home lands depends on its size, its era, and how much you change behind the walls - which is why we price the entire house as one fixed scope before anything is torn apart.
Is it cheaper to renovate the whole house at once or room by room?
All at once, usually. One project means one mobilization, one permit package, and one trade schedule, with pricing locked at a single point in time. Room-by-room phasing spreads out cash flow - a legitimate reason to choose it - but every phase re-mobilizes the crew, re-protects finished work, and prices labour and materials at that later year's rates.
How long does a whole-home renovation take?
Plan on 4 to 8 months on site, plus roughly 2 to 4 months beforehand for design, permits, and ordering - so six months to a year from first conversation to move-in. The single best schedule protection is locking the full scope before demolition, because decisions made mid-build are the ones that cost days.
Can we live in the house during a whole-home renovation?
Yes, and many clients do - we sequence the work so at least one bathroom and a temporary kitchen stay usable throughout. It does extend the schedule and add coordination cost compared to an empty house, while moving out shortens the build but adds housing costs of its own. We'll run both scenarios with you before the plan is locked.
How do I know the price won't creep on a project this big?
Because the price is fixed against a complete scope, agreed before work begins - a whole-home project is exactly where vague allowances do the most damage, so we don't use them. The number changes only if you choose to change the scope, and that decision always happens on paper, with the cost in front of you, before any work follows.